November 2015: Technoset launch two internal initiatives


Technoset launch two internal initiatives to understand changing market conditions and customer requirements /expectations

October 2015: Technoset secure Business Improvement Funding


Technoset secure Business Improvement Funding to support New Year Continuous Improvement Projects at the Rugby Site

March 2015: Technoset / CWAF presentation with OGP and other suppliers




Roadshow Location



February 2015: Technoset at Southern Manufacturing & Electronics Show


  


Technoset have just been at the Southern Manufacturing & Electronics Exhibition.

 

November 2014: TECHNOSET Benefits from Traceability and Process Layout Advantages of PSL Datatrack

TECHNOSET Benefits from Traceability and Process Layout Advantages of PSL Datatrack

April 2014: Dont miss us at Farnborough international Airshow in July 2014

We will be exhibiting at the Farnborough international Airshow.
Look for us on the MAA stand in Hall 1

March 2014: AS9100 audit completed

AS9100 audit completed

February 2014: Increasing our milling capabilities

Two new 4 Axis machining centres installed to strengthen our existing milling capabilities.

February 2014: Our Production area has grown!

Additional 6,300 sq ft production space brought into operation, bringing our total production area to 17,000+ sq ft

January 2014: New Miyano Machine on their way!

Two Miyano BNJ-42SY5 machines ordered together with 64mm ABX-64SYY fixed head Miyano.
This additional capacity will be installed first quarter of 2014.

October 2013: New Ops Director joins the Techno Group

John Stretton joins the Techno Group as Operations Director.

March 2013: New install of 7 Axis SV20

7 Axis SV20 installed means we have additional capacity for more complex work.

January 2012: New Equipement Installed

Two additional Gamma 20mm sliding head machines installed equipped with high pressure coolant.

July 2011: Tornos Gamma 20 Arrives


The beginning of July saw the arrival of our latest machine, the six-axis version of the Tornos Gamma 20. After an initial period of training the machine is now in production.

March 2011: Second Star SR20R3 Delivered

Our second Star SR20R3 was installed at the end of March to meet increasing demand for capacity from our aerospace customers.

March 2011: Technoset Receive SC21 Bronze Award


Technoset received their SC21 Bronze award at the SC21 Task Force meeting held at Bombardier in Belfast on 8th March 2011


 

July 2010: Coventry & Warwickshire Aerospace Forum

Technoset engage with other Coventry & Warwickshire companies to form the Coventry & Warwickshire Aerospace Forum (CWAF). Official launch held at Farnborough Air Show. Guest speaker RH Bob Ainsworth.

July 2010: New Connector Part Project

Technoset have commenced a project to manufacture a sophisticated family of military connectors, utilising all facets of their 3 turret machining centre.

October 2009: Technoset Give Presentation at SC21 Taskforce Meeting

http://www.mas-wm.org/case-studies/technoset-1

May 2009: 'On the right track' Article in Production Engineering Solutions


Production Engineering Solutions just released an article about Technoset covering all the recent changes and improvements within our company. The article is available here starting page 36 by downloading the whole edition, or simply by selecting the 'subcontracting' option on the left of the page.

April 2009: New Milling Machining Centre

We acquired our first machining centre for manufacturing prismatic components. The Doosan Mynx NM410 has a table size of 920 × 430, supports 24 tools and has a maximum spindle speed of 8000 rpm.

April 2009: Technoset puts focus on internal failure

Members of the management team attend the ITO University (Hamilton Sunstrand/United Technologies). MAR09 Technoset build on this customer provided training by implementing a Quality Clinic. The aim of the clinic is to provide structure for "real time" problem resolution. The clinic is composed of 6 important elements surrounding its core fundamental: People. These include Physical location, Performance review, Documented process flow, Gauging & Equipment, Visual Management & Flow and finally Metrics. Technoset is already reaping the benefits of having a Quality Clinic which will continue to be developed.

April 2009: 99% at third party AS9100 audit

Technoset score 99% at third party audit a year on from initial accreditation. The BSI auditor stated in his report that: 'The business continues to be very progressive and has adopted a comprehensive set of methodologies designed to improve business performance. Despite the difficulties imposed by the current financial climate, results show these are now taking effect'

March 2009: Our first Newsletter is now available in our download - PR section!

Our first newsletter is now available for download here

March 2009: 'Technoset Invests To Progress' MAA Article

The article 'Technoset invests to progress' is available on the MAA website by clicking here.

March 2009: Billeting Capability up to 120mm

Technoset can now offer precision components machined from billets up to 120mm diameter

February 2009: Technoset supports MGTS

Technoset supports the local community providing training schemes and work experience to MGTS (Midland Group Training Services) young apprentices.

February 2009: Technoset releases its first Newsletter

The newsletter covers various aspects of the turned parts market as well as changes and improvements within Technoset Ltd.

January 2009: Attended Autosport International show at the NEC Birmingham

January 2009: Tim Holmes appointed Operations Manager

January 2009: Launch of Continuous Improvement Project

November 2008: Technoset Ltd attends Danish Partnering days at Marshall Aerospace Cambridge

October 2008: Kevan Kane visits Jimtof show and factories in Japan

.

April 2008: Technoset Ltd is recommended for AS 9100 certification by BSI auditors

April 2008: Kevan Kane appointed Managing Director

November 2007: Tim Holmes appointed Quality Manager

November 2007: AS 9100 project started

October 2007: Technoset Ltd becomes an SC21 signatory

May 2007: Cimco DNC Max5 Wireless Machine Monitoring implemented

January 2007: Miyano BNE51 Acquired

January 2007: Miyano ABX51 Acquired

January 2007: Star SR20R-III Acquired

January 2006: Star SR10J Acquired

January 2006: Amsonic 4100 Acquired


The Amsonic 4100 Egaclean cleaning plant was selected to replace our old trike plant. The Egaclean is a completely sealed system that cleans components using isoparrafin. The Windows based computer control enables programs to be stored for the differing cleaning requirements of the many components we manufacture.

January 2006: Miyano BNJ42 Acquired

January 2005: Citizen K16 Acquired

January 2005: Nakamura WT150 Acquired

.

January 2005: Star SV20 Acquired

January 2004: Miyano BNJ42 Acquired

January 2004: Star SR30R-II Acquired

.

January 2003: Citizen M32 Acquired

January 2001: Star SR20R Acquired

January 2001: Star SA16R Acquired

January 2000: Citizen M16 Acquired

January 2000: Citizen M32 Acquired

January 2000: Star SA12 Acquired

November 2015: Technoset launch two internal initiatives

October 2015: Technoset secure Business Improvement Funding

March 2015: Technoset / CWAF presentation with OGP and other suppliers

February 2015: Technoset at Southern Manufacturing & Electronics Show